Studi mengenai nilai produktivitas pekerja untuk pekerjaan Shear Wall Pre-Cast dan pekerja pelat lantai Pre-Cast di proyek Aeropolis Residence tahap I = Study of worker productivity in Shear Wall Pre-Cast works and slab Pre-Cast at Aeropolis Residence stage I project

Johan, Riyan Adiputra (2013) Studi mengenai nilai produktivitas pekerja untuk pekerjaan Shear Wall Pre-Cast dan pekerja pelat lantai Pre-Cast di proyek Aeropolis Residence tahap I = Study of worker productivity in Shear Wall Pre-Cast works and slab Pre-Cast at Aeropolis Residence stage I project. Bachelor thesis, Universitas Pelita Harapan.

[img] Text (Title)
Title.pdf

Download (396kB)
[img] Text (Abstract)
Abstract.pdf

Download (13kB)
[img] Text (ToC)
ToC.pdf

Download (88kB)
[img] Text (Chapter1)
Chapter1.pdf
Restricted to Registered users only

Download (187kB)
[img] Text (Chapter2)
Chapter2.pdf
Restricted to Registered users only

Download (406kB)
[img] Text (Chapter3)
Chapter3.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Chapter4)
Chapter4.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (Chapter5)
Chapter5.pdf
Restricted to Registered users only

Download (124kB)
[img] Text (Bibliography)
Bibliography.pdf

Download (167kB)
[img] Text (Appendices)
Appendices.pdf
Restricted to Repository staff only

Download (159kB)
[img] Text (Publication-Agreement)
Publication-Agreement.pdf

Download (354kB)

Abstract

Dunia konstruksi di Indonesia berkembang sangat pesat dalam beberapa tahun terakhir. Hal ini menyebabkan persaingan di antara para penyedia jasa konstruksi, tidak terkecuali pelaksana konstruksi atau kontraktor. Kontraktor yang dapat melakukan pekerjaan konstruksi yang berkualitas dan efisien akan memenangkan persaingan tersebut. Salah satu kunci untuk mencapai efisiensi di dalam pekerjaan konstruksi adalah penjadwalan yang baik dan akurat. Penjadwalan saling berkaitan dengan estimasi durasi dari pekerjaan yang akan dilaksanakan. Nilai produktivitas pekerja dapat digunakan untuk menentukan durasi yang lebih akurat dari pekerjaan yang akan dijadwalkan tersebut. Jadi, nilai produktivitas pekerja memiliki peranan penting untuk menyusun jadwal yang akurat. Untuk mengetahui bagaimana melakukan penjadwalan dengan menggunakan nilai produktivitas pekerja, diperlukan penelitian mengenai nilai produktivitas pekerja itu sendiri. Penelitian dilakukan di Proyek Aeropolis Residence Tahap I untuk jenis pekerjaan shear wall pre-cast dan pekerjaan pelat lantai pre-cast. Pengambilan data dilakukan dengan cara mencatat waktu yang dibutuhkan untuk menyelesaikan sebuah proses pekerjaan dengan menggunakan stopwatch di lapangan. Kemudian, data diolah dengan menggunakan analisis Individual Moving Range Chart dan uji kecukupan data. Jumlah data yang diambil untuk tiap proses pekerjaan yang diteliti sebanyak 20 buah. Apabila data dari sebuah proses pekerjaan yang diteliti tidak lolos uji kecukupan data, maka harus dilakukan penambahan pengambilan data di lapangan. Penelitian ini memberikan hasil berupa nilai produktivitas pekerja untuk jenis pekerjaan shear wall pre-cast dan pelat lantai pre-cast di Proyek Aeropolis Residence Tahap I. Selain itu, dibuat juga sebuah penjadwalan sederhana dengan format Precedence Diagram Network untuk menunjukkan penyusunan sebuah jadwal dengan menggunakan nilai produktivitas pekerja / Construction world in Indonesia has been growing rapidly for the last few years. It causes a competition between construction companies, including contractors. The contractor who can provides the best quality followed by efficiency in their works is the one that can survive. A good scheduling is a key to create efficiency in a construction works. The schedule is interrelated with the estimation of the duration of the construction works. Worker productivity can be used to determine the duration of a construction works accurately. So, worker productivity has a role playing to arrange an accurate schedule. To know how to make a good-accurate schedule by using the worker productivity, a study about the worker productivity itself must be done. The study has been conducted at Aeropolis Residence Stage I in shear wall pre-cast and slab pre-cast works. The data collection was done by noting the time that the worker needs to finish one work cycle by using a stopwatch. Subsequently, the data was analyzed by using an Individual Moving Range Chart and data adequacy test. The amount of data taken for every work-cycle is 20 each. If the data for every work-cycle is not adequate, then the researcher must collect another data. The analysis of the comparison of worker productivity between a works that requires high accuracy and a works that does not requires high accuracy also conducted in this research. The study shows a result of worker productivity in shear wall pre-cast works and slab pre-cast work at Aeropolis Residence Stage I Project. Moreover, a simple schedule (Precedence Diagram Network) was also made to show how to arrange a schedule by using the worker productivity

Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Johan, Riyan AdiputraUNSPECIFIEDUNSPECIFIED
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorTanudjaja, MinawatyUNSPECIFIEDUNSPECIFIED
Additional Information: SK 21-09 JOH s
Uncontrolled Keywords: nilai produktivitas pekerja; durasi pekerjaan; pekerjaan shear wall pre-cast; pekerjaan pelat lantai pre-cast
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Depositing User: Users 9 not found.
Date Deposited: 27 Nov 2018 08:29
Last Modified: 15 Sep 2021 07:41
URI: http://repository.uph.edu/id/eprint/2188

Actions (login required)

View Item View Item