Kajian keterlambatan pelaksanaan proyek menggunakan kriteria malcolm baldridge kategori enam yaitu proses manajemen

Darmawan, Edwin (2011) Kajian keterlambatan pelaksanaan proyek menggunakan kriteria malcolm baldridge kategori enam yaitu proses manajemen. Masters thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Masters)
Creators:
CreatorsNIMEmail
Darmawan, EdwinUNSPECIFIEDUNSPECIFIED
Additional Information: T 39-09 DAR k
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Historic > Faculty/School > Department of Master of Industrial Engineering Program
Historic > Faculty/School > Department of Master of Industrial Engineering Program
Depositing User: Phillips Iman Heri Wahyudi
Date Deposited: 27 Feb 2021 03:35
Last Modified: 27 Feb 2021 03:35
URI: http://repository.uph.edu/id/eprint/24227

Actions (login required)

View Item View Item