Pengembangan program LOB untuk proyek perumahan yang repetitif.

Kiswanto, Rima (2008) Pengembangan program LOB untuk proyek perumahan yang repetitif. Bachelor thesis, Universitas Pelita Harapan.

[img]
Preview
Text (Title)
TITLE.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (89kB) | Preview
[img]
Preview
Text (Abstract)
ABSTRACT.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (117kB) | Preview
[img]
Preview
Text (ToC)
ToC.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (210kB) | Preview
[img]
Preview
Text (Chapter 1)
CHAPTER 1.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (249kB) | Preview
[img] Text (Chapter 2)
CHAPTER II.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (326kB)
[img] Text (Chapter 3)
CHAPTER III.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (513kB)
[img] Text (Chapter 4)
CHAPTER IV.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (503kB)
[img] Text (Chapter 5)
CHAPTER V.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (191kB)
[img]
Preview
Text (Bibliography)
BIBLIOGRAFI.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (156kB) | Preview
[img] Text (Appendices)
APPENDICES.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (11MB)

Abstract

Due to an increasingly competitive environment, construction companies are becoming more sophisticated, narrowing their focus and becomes specialists in certain types of construction. This specialization requires more focused scheduling tools that prove to be better for certain type of project. Linear scheduling technique such as Line of Balance (LOB) method is known to be the most suitable method for projects that are composed of activities of a linear and repetitive nature. Such projects include highways, airfields, pipelines, multiple housing units, and high-rise buildings. The objective of this thesis is to develop a computerized LOB scheduling program that overcomes the problems of existing program. The developed program is using Microsoft Visual Basic 6.0. The challenges associated with LOB scheduling include developing an optimal strategy to reduce project’s delay duration by increasing the rate of production of selected units in activities, allowing parallel activities and improving the visual presentation of LOB graphic. Case study result shows that the developed LOB program is very effective due to reduce project’s delay duration that cause directly to reducing project’s total duration. However the parallel activities in multiple housing units’ project create visual presentation of LOB graphic becomes too crowded.

Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Kiswanto, RimaNIM02120040002UNSPECIFIED
Contributors:
ContributionContributorsNIDN/NIDKEmail
UNSPECIFIEDTanudjaja, MinawatyNIDN327930018minawaty.tanudjaja@lecture.uph.edu
Additional Information: SK 21-04 KIS p = T 56737
Uncontrolled Keywords: Scheduling Technique; Line of Balance; Program Computer.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 14 May 2021 10:26
Last Modified: 09 Jul 2024 02:03
URI: http://repository.uph.edu/id/eprint/24873

Actions (login required)

View Item View Item