Proyek The St. Moritz.

Victor, Victor and Vincent, Vincent (2009) Proyek The St. Moritz. Bachelor thesis, Universitas Pelita Harapan.

[img]
Preview
Text (Title)
TITLE.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (82kB) | Preview
[img]
Preview
Text (Abstract)
ABSTRACT.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (198kB) | Preview
[img]
Preview
Text (ToC)
TOC.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (258kB) | Preview
[img]
Preview
Text (Chapter 1)
CHAPTER 1.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (370kB) | Preview
[img] Text (Chapter 2)
CHAPTER 2.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (483kB)
[img] Text (Chapter 3)
CHAPTER 3.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (2MB)
[img] Text (Chapter 4)
CHAPTER 4.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[img] Text (Chapter 5)
CHAPTER 5.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (220kB)
[img]
Preview
Text (Bibliography)
BIBLIOGRAPHY.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (178kB) | Preview
[img] Text (Appendices)
APPENDICES.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (15MB)

Abstract

Proses pekerjaan pondasi merupakan salah satu bagian terpenting dalam pembangunan gedung tinggi. Tanpa pondasi yang kokoh, tentunya suatu gedung tidak dapat berdiri tegak. Oleh karena itu, laporan ini akan membahas secara mendetil mengenai proses pekerjaan pondasi bored pile beserta dengan beberapa pengujian yang umum digunakan di lapangan. / Process of foundation construction is one of the most important part in constructing a high rise building. Without a good foundation, a building surely can’t stand straight up. For that reason, this report will discuss in great detail about the installation of bored pile foundation with some tests that are often done at the project location.

Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Victor, VictorNIM02120060001UNSPECIFIED
Vincent, VincentNIM02120060022UNSPECIFIED
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorDewobroto, WiryantoNIDN0321106401wiryanto.dewobroto@uph.edu
Additional Information: KP 21-06 VIC p = T 67845
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 14 May 2021 10:27
Last Modified: 17 Jul 2024 04:07
URI: http://repository.uph.edu/id/eprint/24950

Actions (login required)

View Item View Item