Lambok, Tohodo (2002) Analisa model estimasi awal biaya pekerjaan gedung bertingkat. Masters thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Masters) | ||||||
---|---|---|---|---|---|---|---|
Creators: |
|
||||||
Additional Information: | T 29-98 LAM a | ||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | University Subject > Historic > Faculty/School > Master of Civil Engineering Historic > Faculty/School > Master of Civil Engineering |
||||||
Depositing User: | Phillips Iman Heri Wahyudi | ||||||
Date Deposited: | 21 May 2021 06:46 | ||||||
Last Modified: | 21 May 2021 06:46 | ||||||
URI: | http://repository.uph.edu/id/eprint/25992 |
Actions (login required)
View Item |