Analisis lead time pembuatan mold tipe MOT-017 di production engineering department PT. National Gobel Jakarta.

Priyono, Eri (2003) Analisis lead time pembuatan mold tipe MOT-017 di production engineering department PT. National Gobel Jakarta. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Priyono, EriUNSPECIFIEDUNSPECIFIED
Additional Information: SK 33-00 PRI a
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 18 May 2021 09:29
Last Modified: 18 May 2021 09:29
URI: http://repository.uph.edu/id/eprint/31661

Actions (login required)

View Item View Item