Optimalisasi waktu kerja pada Spare Part Receiving Center (SPRC) departemen spare part PT. Mulia Keramik Indah Raya, Cikarang.

Rini, Lukito (2004) Optimalisasi waktu kerja pada Spare Part Receiving Center (SPRC) departemen spare part PT. Mulia Keramik Indah Raya, Cikarang. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Rini, LukitoUNSPECIFIEDUNSPECIFIED
Additional Information: KP 33-01 RIN o
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 18 May 2021 09:38
Last Modified: 18 May 2021 09:38
URI: http://repository.uph.edu/id/eprint/32009

Actions (login required)

View Item View Item