Darmawan, Edwin (2011) Kajian keterlambatan pelaksanaan proyek menggunakan kriteria malcolm baldridge kategori enam yaitu proses manajemen. Masters thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Masters) |
---|---|
Creators: | Creators NIM Email ORCID Darmawan, Edwin UNSPECIFIED UNSPECIFIED UNSPECIFIED |
Additional Information: | T 39-09 DAR k |
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering |
Divisions: | University Subject > Historic > Faculty/School > Department of Master of Industrial Engineering Program Historic > Faculty/School > Department of Master of Industrial Engineering Program |
Depositing User: | Phillips Iman Heri Wahyudi |
Date Deposited: | 27 Feb 2021 03:35 |
Last Modified: | 27 Feb 2021 03:35 |
URI: | http://repository.uph.edu/id/eprint/24227 |