Perancangan program parkir dan retail sebagai fasilitas pendukung lalu lintas pada stasiun MRT Cipete

Tanza, Steven (2015) Perancangan program parkir dan retail sebagai fasilitas pendukung lalu lintas pada stasiun MRT Cipete. Bachelor thesis, Universitas Pelita Harapan.

[thumbnail of Title] Text (Title)
Title.pdf

Download (1MB)
[thumbnail of Abstract] Text (Abstract)
Abstract.pdf

Download (160kB)
[thumbnail of ToC] Text (ToC)
ToC.pdf

Download (2MB)
[thumbnail of Chapter1] Text (Chapter1)
Chapter1.pdf
Restricted to Registered users only

Download (435kB)
[thumbnail of Chapter2] Text (Chapter2)
Chapter2.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of Chapter3] Text (Chapter3)
Chapter3.pdf
Restricted to Registered users only

Download (2MB)
[thumbnail of Chapter4] Text (Chapter4)
Chapter4.pdf
Restricted to Registered users only

Download (2MB)
[thumbnail of Chapter5] Text (Chapter5)
Chapter5.pdf
Restricted to Registered users only

Download (99kB)
[thumbnail of Bibliography] Text (Bibliography)
Bibliography.pdf

Download (98kB)
[thumbnail of Appendices] Text (Appendices)
Appendices.pdf
Restricted to Registered users only

Download (21MB)
[thumbnail of Publication Agreement] Text (Publication Agreement)
Publication-Agreement.pdf

Download (828kB)

Abstract

This final project is written based on the necessity of traffic system and planning, especially in a MRT station area which located in Cipete. Through this structural study, it is expected for this research to be able to produce a design alternative for traffic support facility. Supporting facilities such as pedestrian facility, parking and bus stop facility. General problems in this study are: 1) Which traffic supporting facility can be applied to distribute traffic density problem in Cipete MRT station area, 2) What programs can distribute the traffic density problem except parking facility. The method in use is a descriptive method with qualitative research form. Through descriptive research method, theory study about parking system and park and ride system quoted from a book source Park and Ride Planning and Design Guidelines, 1995 Parson Brinckerhoff. Another source from the internet study about traffic supporting facilities according to Minister’s Decision of Transportation number KM 65 year 1993.Qualitative research was done in three days, on rush hour from 7 AM – 9 AM and 4 PM – 6.30 PM. The research was done to find a problem that occurs on traffic during the rush hour. Based on the result of research on site condition at Fatmawati street, it is found that the density during rush hour can be decreased by parking and park and ride system. The rush hour can also be accommodate with distribution management in new programs. These programs are useful to add new activities that affect the distribution during rush hours. Supporting facilities that has been planned are retails and parking building. Also, it is known that the parking capacity needed is based on the calculation Cipete population.
Item Type: Thesis (Bachelor)
Creators:
Creators
NIM
Email
ORCID
Tanza, Steven
UNSPECIFIED
UNSPECIFIED
UNSPECIFIED
Contributors:
Contribution
Contributors
NIDN/NIDK
Email
Thesis advisor
Wangsadihardja, Stanley
UNSPECIFIED
UNSPECIFIED
Additional Information: PA 22-11 TAN p
Uncontrolled Keywords: traffic supporting facility, MRT station, parking building
Subjects: N Fine Arts > NA Architecture
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > School of Design > Architecture
Current > Faculty/School - UPH Karawaci > School of Design > Architecture
Depositing User: Users 5 not found.
Date Deposited: 28 Feb 2019 08:46
Last Modified: 03 Dec 2021 08:05
URI: http://repository.uph.edu/id/eprint/2431

Actions (login required)

View Item
View Item