Analisis perbandingan metode Critical Path Method dan Critical Chain Method pada penyusunan jadwal proyek konstruksi.

Sudharsono, Wiwin (2009) Analisis perbandingan metode Critical Path Method dan Critical Chain Method pada penyusunan jadwal proyek konstruksi. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Sudharsono, WiwinUNSPECIFIEDUNSPECIFIED
Additional Information: SK 21-05 SUD a
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 14 May 2021 10:28
Last Modified: 14 May 2021 10:28
URI: http://repository.uph.edu/id/eprint/24989

Actions (login required)

View Item View Item