Abdullah, Abdullah (2012) Analisis faktor keterlambatan penyelesaian pekerjaan proyek konstruksi di daerah Karawang. Bachelor thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Bachelor) |
---|---|
Creators: | Creators NIM Email ORCID Abdullah, Abdullah UNSPECIFIED UNSPECIFIED UNSPECIFIED |
Additional Information: | SK 21-06 ABD a |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering |
Depositing User: | Mrs Veronica Fitri Astuti |
Date Deposited: | 14 May 2021 10:33 |
Last Modified: | 14 May 2021 10:33 |
URI: | http://repository.uph.edu/id/eprint/25063 |