Analisis risiko keterlambatan waktu pelaksanaan proyek pada kontraktor

Suryani, Lilis (2015) Analisis risiko keterlambatan waktu pelaksanaan proyek pada kontraktor. Masters thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Masters)
Creators:
CreatorsNIMEmail
Suryani, LilisUNSPECIFIEDUNSPECIFIED
Additional Information: T 29-13 SUR a
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: University Subject > Historic > Faculty/School > Master of Civil Engineering
Historic > Faculty/School > Master of Civil Engineering
Depositing User: Phillips Iman Heri Wahyudi
Date Deposited: 21 May 2021 06:52
Last Modified: 21 May 2021 06:52
URI: http://repository.uph.edu/id/eprint/28720

Actions (login required)

View Item View Item