Setiawati, Dwi Novi (2016) Analisis faktor keterlambatan proses lelang konstruksi dengan menggunakan e-tender pada proyek-proyek konstruksi di dinas sumber daya air dan pemukima. Masters thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Masters) | ||||||
---|---|---|---|---|---|---|---|
Creators: |
|
||||||
Additional Information: | T 29-14 SET a | ||||||
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | ||||||
Divisions: | University Subject > Historic > Faculty/School > Master of Civil Engineering Historic > Faculty/School > Master of Civil Engineering |
||||||
Depositing User: | Phillips Iman Heri Wahyudi | ||||||
Date Deposited: | 21 May 2021 06:53 | ||||||
Last Modified: | 21 May 2021 06:53 | ||||||
URI: | http://repository.uph.edu/id/eprint/28733 |
Actions (login required)
View Item |