Hartman, Aditya (2004) Analisis waktu baku dan produktivitas pekerja pada bagian assembly di PT. Nikkatsu Electric Works. Bachelor thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Bachelor) |
---|---|
Creators: | Creators NIM Email ORCID Hartman, Aditya UNSPECIFIED UNSPECIFIED UNSPECIFIED |
Additional Information: | KP 33-00 HAR a |
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering |
Divisions: | University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering |
Depositing User: | Mrs Veronica Fitri Astuti |
Date Deposited: | 18 May 2021 09:36 |
Last Modified: | 18 May 2021 09:36 |
URI: | http://repository.uph.edu/id/eprint/31951 |