Penerapan waktu baku dan utilisasi alat produksi tambang untuk meningkatkan kapasitas produksi di PT. Bumisedimen Trashindotama.

Rahadianto, Rocky Prawisuda (2005) Penerapan waktu baku dan utilisasi alat produksi tambang untuk meningkatkan kapasitas produksi di PT. Bumisedimen Trashindotama. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Rahadianto, Rocky PrawisudaUNSPECIFIEDUNSPECIFIED
Additional Information: SK 33-00 RAH p
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 18 May 2021 09:45
Last Modified: 18 May 2021 09:45
URI: http://repository.uph.edu/id/eprint/32207

Actions (login required)

View Item View Item