Agustiawan, Sonny (2006) Minimalisasi waktu produksi untuk produk 45227 pada divisi assembling bagian perakitan di PT. Tanamas Industry Comunitas Unit III. Bachelor thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Bachelor) |
---|---|
Creators: | Creators NIM Email ORCID Agustiawan, Sonny UNSPECIFIED UNSPECIFIED UNSPECIFIED |
Additional Information: | SK 33-02 AGU m |
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering |
Divisions: | University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering |
Depositing User: | Mrs Veronica Fitri Astuti |
Date Deposited: | 18 May 2021 09:49 |
Last Modified: | 18 May 2021 09:49 |
URI: | http://repository.uph.edu/id/eprint/33091 |