Perhitungan peningkatan produktivitas PT. WBW dengan peta tangan kiri - tangan kanan, metode perhitungan waktu MTM 1, dan perancangan stasiun kerja.

Jonathan, Willyam (2006) Perhitungan peningkatan produktivitas PT. WBW dengan peta tangan kiri - tangan kanan, metode perhitungan waktu MTM 1, dan perancangan stasiun kerja. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Jonathan, WillyamUNSPECIFIEDUNSPECIFIED
Additional Information: KP 33-03 JON p
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 18 May 2021 09:59
Last Modified: 18 May 2021 09:59
URI: http://repository.uph.edu/id/eprint/33248

Actions (login required)

View Item View Item