Penentuan selang waktu penggantian pemeriksaan, serta availability dan reliability komponen-komponen kritis dalam upaya meminimasi downtime mesin di PT. Sinar Inti Elektrindo Raya.

Mexroy, Ivan (2006) Penentuan selang waktu penggantian pemeriksaan, serta availability dan reliability komponen-komponen kritis dalam upaya meminimasi downtime mesin di PT. Sinar Inti Elektrindo Raya. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Mexroy, IvanUNSPECIFIEDUNSPECIFIED
Additional Information: KP 33-03 MEX p
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 18 May 2021 10:02
Last Modified: 18 May 2021 10:02
URI: http://repository.uph.edu/id/eprint/33289

Actions (login required)

View Item View Item