Perbaikan proses produksi pembuatan Cover GM5Z-3B di PT Dynaplast tbk. plant iv-Cibitung dengan menggunakan metode Six Sigma.

Mexroy, Ivan (2007) Perbaikan proses produksi pembuatan Cover GM5Z-3B di PT Dynaplast tbk. plant iv-Cibitung dengan menggunakan metode Six Sigma. Bachelor thesis, Universitas Pelita Harapan.

Full text not available from this repository.
Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Mexroy, IvanUNSPECIFIEDUNSPECIFIED
Additional Information: SK 33-03 MEX p
Subjects: T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering
Depositing User: Mrs Veronica Fitri Astuti
Date Deposited: 18 May 2021 10:31
Last Modified: 18 May 2021 10:31
URI: http://repository.uph.edu/id/eprint/34088

Actions (login required)

View Item View Item