Lie, Muhiith Sutrisno (2011) Perancangan fasilitas produksi produk Zeolite Granular <5mm di CV. Ciptayasa. Bachelor thesis, Universitas Pelita Harapan.
Full text not available from this repository.Item Type: | Thesis (Bachelor) | ||||||
---|---|---|---|---|---|---|---|
Creators: |
|
||||||
Additional Information: | SK 33-07 LIE p | ||||||
Subjects: | T Technology > T Technology (General) > T55.4-60.8 Industrial engineering. Management engineering | ||||||
Divisions: | University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Industrial Engineering |
||||||
Depositing User: | Mrs Veronica Fitri Astuti | ||||||
Date Deposited: | 18 May 2021 10:36 | ||||||
Last Modified: | 18 May 2021 10:36 | ||||||
URI: | http://repository.uph.edu/id/eprint/35350 |
Actions (login required)
View Item |