Application method of lean six sigma theorem on the performance of a construction project through project management: a case study, Terminal Terpadu Pulo Gebang Project = Penerapan metode lean six sigma pada performa proyek konstruksi ditinjau dari manajemen proyek : studi kasus, Proyek Terminal Terpadu Pulo Gebang

Valerian, Kevin (2012) Application method of lean six sigma theorem on the performance of a construction project through project management: a case study, Terminal Terpadu Pulo Gebang Project = Penerapan metode lean six sigma pada performa proyek konstruksi ditinjau dari manajemen proyek : studi kasus, Proyek Terminal Terpadu Pulo Gebang. Bachelor thesis, Universitas Pelita Harapan.

[img] Text (Title)
Title.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (3MB)
[img] Text (Abstract)
Abstract.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (290kB)
[img] Text (ToC)
ToC.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (310kB)
[img] Text (Chapter1)
Chapter1.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (357kB)
[img] Text (Chapter2)
Chapter2.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (470kB)
[img] Text (Chapter3)
Chapter3.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[img] Text (Chapter4)
Chapter4.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (516kB)
[img] Text (Chapter5)
Chapter5.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (336kB)
[img] Text (Bibliography)
Bibliography.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (291kB)
[img] Text (Appendices)
Appendices.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[img] Text (Publication-Agreement)
Publication-Agreement.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (351kB)

Abstract

Indonesian Construction Platform Industry until 2030, issued by the The National Construction Services Development Institute (LPJKN) aims to create Indonesia's construction industry with competitive advantage, sustainability, professional, and added value. Currently, the situation in Indonesia’s construction has some highrisk conditions such as: fluctuations in dollar, material price that continue to rise, inflation in the economic, and political, also low return such as: long execution time and difficulty in payment. With these conditions it is difficult to achieve the objectives referred above. Terminal Terpadu Pulo Gebang Project is one of the example of these conditions which has high risk and low return. The project has difficulty in performance which is sourced, based on the resources. This thesis attempt to provide an alternative solutions to the problems that exist in Pulo Gebang, by using one of the productivity theory known as Lean Six Sigma. This theory is a productivity theory that has been proven and tested in the world of manufacturing and now will be applied to a construction project. Lean Six Sigma is a theory that focuses on reducing productivity and eliminating waste by continuously improving on a regular basis to achieve the perfect sigma value, which is the ideal productivity. Systematically theory of Lean Six Sigma work from the big problem and pursuing the problem through root cause and and finally making continuous improvement, on the crucial aspects of the process The application of lean six sigma productivity theory can help improve productivity and performance of a construction project.

Item Type: Thesis (Bachelor)
Creators:
CreatorsNIMEmail
Valerian, Kevin02120080010UNSPECIFIED
Contributors:
ContributionContributorsNIDN/NIDKEmail
Thesis advisorTanudjaja, MinawatyNIDN0308056907UNSPECIFIED
Thesis advisorDjukardi, Andreas KurniawanNIDN0322107006UNSPECIFIED
Additional Information: SK 21-08 VAL p
Uncontrolled Keywords: productivity in services; lean, six sigma; lean six sigma; performance improvements in construction; construction management
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Current > Faculty/School - UPH Karawaci > Faculty of Science and Technology > Civil Engineering
Depositing User: Users 3 not found.
Date Deposited: 16 Oct 2018 07:33
Last Modified: 13 Dec 2021 06:32
URI: http://repository.uph.edu/id/eprint/1031

Actions (login required)

View Item View Item