Aditya, Muhamad Rizki (2018) Analisis faktor-faktor manajemen pembiayaan pekerjaan upper structural system pada proyek Jembatan Cimanuk di Majalengka - Jawa Barat. Masters thesis, Universitas Pelita Harapan.
![Title [thumbnail of Title]](http://repository.uph.edu/style/images/fileicons/text.png)
title.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (1MB)
![Abstract [thumbnail of Abstract]](http://repository.uph.edu/style/images/fileicons/text.png)
abstract.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (38kB)
![ToC [thumbnail of ToC]](http://repository.uph.edu/style/images/fileicons/text.png)
toc.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (119kB)
![Chapter 1 [thumbnail of Chapter 1]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 1.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (140kB)
![Chapter 2 [thumbnail of Chapter 2]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 2.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (496kB)
![Chapter 3 [thumbnail of Chapter 3]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 3.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (205kB)
![Chapter 4 [thumbnail of Chapter 4]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 4.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (502kB)
![Chapter 5 [thumbnail of Chapter 5]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 5.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (170kB)
![Bibliography [thumbnail of Bibliography]](http://repository.uph.edu/style/images/fileicons/text.png)
bibliography.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (128kB)
Abstract
The process of selecting the material of the bridge structure has a special
uniqueness. In the Cimanuk Bridge project, the existing selection of top structural
materials using concrete materials. In the implementation of construction on the
ground, in the end, steel structure material becomes the top priority. In order to carry
out the structural work on top, project financing needs to be considered. Therefore, in
this research, systematic analysis is needed to identify the financing indicators of the
structural work specifically on the Bridge project.
The overall research problems are: identifying the project financing
indicators for the bridge structure work, analyzing the financing indicators of the
upper structural system construction project at Cimanuk Bridge in the planning stage
and provide recommendations for improvement of the financing indicators. However,
the writing of this research will be focused on analyzing the project financing
performance of the financing management process, and identifying the indicators that
affect the financing of the bridge structure project. The relevant literature review of
this research discusses several issues: project cost management, construction process,
construction implementation method, structural system, bridge project, steel,
concrete, and relevant research results. This research is complete using quantitative
method with questionnaire as research instrument which is expected to produce the
necessary improvement for the project under study.
After the data of questionnaire result through testing from reability test until
model test got 4 variables that have an effect on to cost performance of Cimanuk
Bridge project. Namely: change of specification, rent cost of scaffolding, Project
Manager knowledge about financing management and Project Manager experience in
handling project. / Proses pemilihan bahan struktur jembatan memiliki keunikan khusus. Pada
proyek Jembatan Cimanuk, secara eksisting dilakukan pemilihan bahan struktur atas
dengan menggunakan bahan beton. Dalam pelaksanaan konstruksi di lapangan, pada
akhirnya, bahan struktur baja menjadi prioritas utama. Dalam rangka pelaksanaan
pekerjaan struktur atas, pembiayaan proyek perlu diperhatikan. Untuk itu dalam
penelitian ini, perlu dilakukan analisis sistematis untuk mengidentifikasi indikator
pembiayaan pekerjaan struktur secara khusus pada proyek Jembatan.
Permasalahan penelitian ini secara keseluruhan adalah: mengidentifikasi
indikator pembiayaan proyek pekerjaan struktur jembatan, menganalisis indikator
pembiayaan proyek konstruksi upper structural system pada Jembatan Cimanuk di
tahap perencanaan dan memberikan rekomendasi perbaikan dari indikator
pembiayaan tersebut. Namun penulisan penelitian ini akan difokuskan dengan
menganalisis kinerja pembiayaan proyek terhadap proses manajemen pembiayaan,
dan mengidentifikasi indikator yang mempengaruhi pembiayaan proyek pekerjaan
struktur jembatan. Berbagai kajian pustaka yang relevan sehubungan dengan
penelitian ini membahas tentang beberapa hal, yaitu: pembiayaan proyek (project
cost management), proses konstruksi, metode pelaksanaan konstruksi, sistem struktur,
proyek jembatan, baja, beton, dan berbagai hasil penelitian yang relevan. Penelitian
ini secara lengkap menggunakan metode kuantitatif dengan kuesioner sebagai
instrument penelitian yang diharapkan akan menghasilkan improvement yang
diperlukan bagi proyek yang diteliti.
Setelah data hasil kuesioner melalui pengujian dari uji reabilitas sampai
dengan uji model didapatkan 4 variabel yang berpengaruh terhadap kinerja biaya
proyek Jembatan Cimanuk. Yaitu : perubahan spesifikasi, biaya sewa perancah,
pengetahuan Project Manager tentang manajemen pembiayaan dan pengalaman
Project Manager dalam menangani proyek.
Item Type: | Thesis (Masters) |
---|---|
Creators: | Creators NIM Email ORCID Aditya, Muhamad Rizki NIM00000021162 UNSPECIFIED UNSPECIFIED |
Contributors: | Contribution Contributors NIDN/NIDK Email Thesis advisor Bali, Ika UNSPECIFIED UNSPECIFIED |
Additional Information: | T 29-15 ADI a |
Uncontrolled Keywords: | project cost management ; construction project ; upper structural system ; bridge |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | University Subject > Historic > Faculty/School > Master of Civil Engineering Historic > Faculty/School > Master of Civil Engineering |
Depositing User: | Users 15 not found. |
Date Deposited: | 28 Feb 2019 07:40 |
Last Modified: | 09 Nov 2021 06:17 |
URI: | http://repository.uph.edu/id/eprint/2625 |