Novannius, Ade (2018) Analisis risiko pembangunan konstruksi bangunan gedung tinggi hunian di DKI Jakarta dalam meningkatkan kinerja mutu proyek. Masters thesis, Universitas Pelita Harapan.
![Title [thumbnail of Title]](http://repository.uph.edu/style/images/fileicons/text.png)
title.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (901kB)
![Abstract [thumbnail of Abstract]](http://repository.uph.edu/style/images/fileicons/text.png)
abstract.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (200kB)
![ToC [thumbnail of ToC]](http://repository.uph.edu/style/images/fileicons/text.png)
toc.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (236kB)
![Chapter 1 [thumbnail of Chapter 1]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 1.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (205kB)
![Chapter 2 [thumbnail of Chapter 2]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 2.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (411kB)
![Chapter 3 [thumbnail of Chapter 3]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 3.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (364kB)
![Chapter 4 [thumbnail of Chapter 4]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 4.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (572kB)
![Chapter 5 [thumbnail of Chapter 5]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 5.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (174kB)
![Bibliography [thumbnail of Bibliography]](http://repository.uph.edu/style/images/fileicons/text.png)
bibliography.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (228kB)
![Appendices [thumbnail of Appendices]](http://repository.uph.edu/style/images/fileicons/text.png)
appendices.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (543kB)
Abstract
Construction is a project that has a relatively high risk potential compared
to non-construction work such as manufacturing. Construction projects especially
high rise residential buildings have anticipated risks from the beginning, especially
in the process of building high-rise residential buildings in DKI Jakarta, not yet
have a good approach in order to prevent and overcome the risks that can occur
during the construction that can affect the quality a construction project.
The problem of this research as a whole is to analyze all factors and risk
variables in the process of building high-rise building, how to measure the quality
performance in the construction of high rise residential building in DKI Jakarta,
what are the facts and important variables of building construction project model
of building DKI Jakarta, and what is the recommendation for improvement of the
selected model in the construction of a high rise residential building project in DKI
Jakarta. This study will analyze the respondents of the assigned recipients in this
case the selected contractors.
The purpose of this research is to look for the main factors that affect the
quality performance of building construction projects, and the actions that need to
be taken into account against the risks that may affect the quality performance in
the construction project construction process. Data analysis was processed by
using statistical analysis of SPSS 2.0. From the data analysis, there are four
factors and seven major risk variables that affect the quality performance of high
rise residential building construction in DKI Jakarta, namely: labor force (X28
occurrence of labor disputes in the field in the construction process), design
evaluation factors and (X2 the occurrence of design changes / specifications in the
construction process may affect the performance of the quality of development, X1
the occurrence of design errors in the construction process may affect the quality
performance in the development process), the implementation factor, (X42 Iron
adjustment and assembly is not appropriate / construction, X46 occurrence of
faults on field surveys in the construction process), management factors (X26 ie
low level of management discipline in the construction process may affect the
quality performance of development, X8 lack of control and coordination in the
team in the construction process may affect the performance of quality
construction in the construction process.). / Konstruksi merupakan proyek yang memiliki potensi risiko relatif tinggi
dibandingkan pekerjaan non konstruksi seperti manufaktur. Proyek konstruksi
khususnya bangunan gedung tinggi hunian memiliki risiko yang dapat diantisipasi
sejak awal, Secara khusus dalam proses pembangunan gedung tinggi hunian di
DKI Jakarta, belum memiliki pendekatan yang baik dalam rangka mencegah dan
menanggulangi risiko yang dapat terjadi pada saat pelaksanaan konstruksi yang
dapat berpengaruh terhadap mutu suatu proyek konstruksi.
Permasalahan penelitian ini secara keseluruhan adalah untuk: menganalisis
apasaja faktor dan variabel risiko pada proses pembangunan bangunan gedung
tinggi hunian, bagaimana mengukur kinerja mutu pada proses pembangunan
bangunan gedung tinggi hunian di DKI Jakarta, apa saja fakto dan variabel penting
model pembangunan proyek konstruksi bangunan gedung di DKI Jakarta, dan apa
rekomendasi perbaikan dari model yang terpilih pada pembangunan proyek
konstruksi bangunan gedung tinggi hunian di DKI Jakarta. Penelitian ini akan
menganalisis responden penerima tugas dalam hal ini kontraktor terpilih.
Tujuan penelitian ini adalah Mencari faktor utama yang mempengaruhi
kinerja mutu pembangunan proyek bangunan gedung, dan tindakan yang perlu
diperhitungkan terhadap risiko-risiko yang dapat mempengaruhi kinerja mutu
dalam proses pembangunan proyek konstruksi. Analisis data diolah dengan
menggunakan analisis statistic SPSS 2.0. Dari hasil analisis data menunjukan ada
Empat faktor dan Tujuh variabel risiko utama yang berpengaruh terhadap kinerja
mutu pembangunan konstruksi bangunan gedung tinggi hunian di DKI Jakarta,
yaitu: faktor tenaga kerja (X28 terjadinya perselisihan tenaga kerja di lapangan
dalam proses konstruksi), faktor evaluasi desain dan teknologi (X2 terjadinya
perubahan desain / spesifikasi dalam proses konstruksi dapat mempengaruhi
kinerja mutu pembangunan, X1 terjadinya kesalahan desain dalam proses
konstruksi dapat mempengaruhi kinerja mutu dalam proses pembangunan), faktor
pelaksanaan, (X42 Penyetelan dan perakitan besi yang tidak tepat/tidak sesuai
dalam proses konstruksi, X46 terjadinya kesalahan pada survey di lapangan dalam
proses konstruksi), faktor manajemen (X26 yaitu tingkat disiplin manajemen yang
rendah dalam proses konstruksi dapat mempengaruhi kinerja mutu pembangunan,
X8 kurangnya pengendalian dan koordinasi dalam team dalam proses konstruksi
dapat mempengaruhi kinerja mutu pembangunan dalam proses konstruksi.)
Item Type: | Thesis (Masters) |
---|---|
Creators: | Creators NIM Email ORCID Novannius, Ade NIM00000022675 UNSPECIFIED UNSPECIFIED |
Contributors: | Contribution Contributors NIDN/NIDK Email Thesis advisor Simanjuntak, Manlian Ronald A. NIDN0330117401 UNSPECIFIED |
Additional Information: | T 29-15 NOV a |
Uncontrolled Keywords: | risk management ; risk identification ; quality performance ; development process ; high rise building ; occupancy |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | University Subject > Historic > Faculty/School > Master of Civil Engineering Historic > Faculty/School > Master of Civil Engineering |
Depositing User: | Users 15 not found. |
Date Deposited: | 28 Feb 2019 07:40 |
Last Modified: | 09 Nov 2021 06:31 |
URI: | http://repository.uph.edu/id/eprint/2628 |