Devi, Devi (2016) Analisis manajemen pengadaan bahan konstruksi dalam meningkatkan kinerja biaya proyek pada perusahaan kontraktor acst di Jakarta Selatan dan Pusat. Masters thesis, Universitas Pelita Harapan.
![Title [thumbnail of Title]](http://repository.uph.edu/style/images/fileicons/text.png)
titlea.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (1MB)
![Abstract [thumbnail of Abstract]](http://repository.uph.edu/style/images/fileicons/text.png)
abstract.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (354kB)
![ToC [thumbnail of ToC]](http://repository.uph.edu/style/images/fileicons/text.png)
toc.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (512kB)
![Chapter 1 [thumbnail of Chapter 1]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 1.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (414kB)
![Chapter 2 [thumbnail of Chapter 2]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 2.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (3MB)
![Chapter 3 [thumbnail of Chapter 3]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 3.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (434kB)
![Chapter 4 [thumbnail of Chapter 4]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 4.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (503kB)
![Chapter 5 [thumbnail of Chapter 5]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 5.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (366kB)
Preview
bibliography.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (348kB) | Preview
![Appendices [thumbnail of Appendices]](http://repository.uph.edu/style/images/fileicons/text.png)
appendices.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (2MB)
Abstract
Environmental conditions in South Jakarta and Central Jakarta have unique
individual. In connection with this case of course the process of implementation
of construction projects in particular in South Jakarta and Central Jakarta together
will support the positive growth of Jakarta in the future. In the process of
construction, supply of materials / construction material and equipment supply has
an important role and contribute as much as 50-60% of the total cost of the
planned construction. Certainly important for the contractor to be able to have a
good procurement management see the magnitude of the portion of financing the
procurement of construction materials in a construction project value.
Procurement of materials in question covers the planning, purchasing, receiving,
storage, material expenses and evaluation of the use of materials. Each process
supports the achievement of the successful performance of the project cost of
construction. For this reason this study will explain and resolve the results of a
study of 4 (four) the research problem, namely: condition of the existing system of
procurement of construction materials to the contracting companies "ACST" in
South Jakarta and Central Jakarta, factors and variables are important
management of procurement of construction materials, performance fees project
management and analysis of the effect of procurement of construction materials in
order to improve the performance of the project cost to the contractor "ACST" in
South Jakarta and Central Jakarta.
This study will examine the process of research instruments both
qualitatively and quantitatively. Selected respondent is the recipient of duty for
contractors in the South Jakarta and Central Jakarta, will make an important
contribution to this research. Areas of research that will be examined in this study,
namely: planning, evaluation system needs, material procurement system,
admissions materials, materials inventory management system, control system
allocation, evaluation of the use of materials.
Through selected research methods, this study will make a recommendation
in the form of a priority for decision makers in the project, so that the process of
procurement of materials can be maximally improve the performance expected
project costs. Through this research as well, specifically the assignees are
contractors in South Jakarta and Central Jakarta will be systematically and
strategically can prepare and execute materials management to improve project
performance. Through the results of this study improvements to the contractor
who carried out include the flow of the procurement process and methods for
planning and material control. / Kondisi lingkungan di Jakarta Selatan dan Jakarta Pusat memiliki keunikan
masing-masing. Sehubungan dengan hal ini tentunya proses penyelenggaraan
proyek konstruksi secara khusus di Jakarta Selatan dan Jakarta Pusat bersamasama akan mendukung pertumbuhan positif DKI Jakarta di masa mendatang.
Dalam proses konstruksi, penyediaan bahan/material dan penyediaan peralatan
konstruksi memiliki peran penting dan memberikan kontribusi sebesar 50 – 60 %
dari total biaya konstruksi yang direncanakan. Penting tentunya bagi pihak
kontraktor pelaksana untuk dapat memiliki manajemen pengadaan yang baik
melihat besarnya porsi pembiayaan pengadaan material konstruksi dalam sebuah
nilai proyek konstruksi. Pengadaan bahan yang dimaksud mencangkup
perencanaan, pembelian, penerimaan, penyimpanan, pengeluaran material dan
evaluasi penggunaan material. Setiap proses mendukung pencapaian keberhasilan
kinerja biaya proyek konstruksi. Untuk itulah penelitian ini akan menjelaskan dan
menyelesaikan hasil kajian terhadap 4 (empat) permasalahan penelitian, yaitu:
kondisi eksisting sistem pengadaan bahan konstruksi pada perusahaan kontraktor
“ACST” di Jakarta Selatan dan Jakarta Pusat, faktor dan variabel penting
manajemen pengadaan bahan konstruksi, kinerja biaya proyek dan analisis
pengaruh manajemen pengadaan bahan konstruksi dalam upaya meningkatkan
kinerja biaya proyek pada perusahaan kontraktor “ACST” di Jakarta Selatan dan
Jakarta Pusat.
Proses penelitian ini akan mengkaji instrumen penelitian baik secara
kualitatif dan kuantitatif. Responden terpilih merupakan penerima tugas yaitu
kontraktor di lingkungan Jakarta Selatan dan Jakarta Pusat, akan memberikan
kontribusi penting terhadap hasil penelitian ini. Faktor penelitian yang akan dikaji
dalam penelitian ini, yaitu: perencanaan, sistem evaluasi kebutuhan, sistem
pengadaan bahan, sistem penerimaan bahan, sistem manajemen persediaan bahan,
sistem pengendalian alokasi, evaluasi penggunaan bahan.
Melalui metode penelitian terpilih, penelitian ini akan menghasilkan
rekomendasi berupa prioritas bagi pengambil keputusan di proyek, agar proses
pengadaan bahan dapat secara maksimal meningkatkan kinerja biaya proyek yang
diharapkan. Melalui penelitian ini pula, secara khusus pihak penerima tugas yaitu
kontraktor di wilayah Jakarta Selatan dan Jakarta Pusat akan secara sistematis dan
strategis dapat mempersiapkan dan melaksanakan manajemen bahan dalam
meningkatkan kinerja proyek. Melalui hasil penelitian ini perbaikan bagi
kontraktor yang dilakukan antara lain flow proses pengadaan dan metode untuk
perencanaan dan kontrol material.
Item Type: | Thesis (Masters) |
---|---|
Creators: | Creators NIM Email ORCID Devi, Devi NIM00000013779 UNSPECIFIED UNSPECIFIED |
Contributors: | Contribution Contributors NIDN/NIDK Email Thesis advisor Simanjuntak, Manlian Ronald A. NIDN0330117401 UNSPECIFIED |
Additional Information: | T 29-14 DEV a |
Uncontrolled Keywords: | procurement ; construction materials ; cost performance ; the contractor |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | University Subject > Historic > Faculty/School > Master of Civil Engineering Historic > Faculty/School > Master of Civil Engineering |
Depositing User: | Phillips Iman Heri Wahyudi |
Date Deposited: | 21 May 2021 06:54 |
Last Modified: | 21 Sep 2022 06:42 |
URI: | http://repository.uph.edu/id/eprint/28746 |