Strategi DC Interior untuk Mengoptimasi Desain

Suripto, Chyntia Angel (2025) Strategi DC Interior untuk Mengoptimasi Desain. Bachelor thesis, Universitas Pelita Harapan.

[thumbnail of Title]
Preview
Text (Title)
Title.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (376kB) | Preview
[thumbnail of Abstract] Text (Abstract)
Abstract.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (386kB)
[thumbnail of ToC] Text (ToC)
ToC.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (646kB)
[thumbnail of Chapter 1] Text (Chapter 1)
Chapter 1.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (631kB)
[thumbnail of Chapter 2] Text (Chapter 2)
Chapter 2.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (553kB)
[thumbnail of Chapter 3] Text (Chapter 3)
Chapter 3.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[thumbnail of Chapter 4] Text (Chapter 4)
Chapter 4.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (2MB)
[thumbnail of Chapter 5] Text (Chapter 5)
Chapter 5.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[thumbnail of Bibliography] Text (Bibliography)
Bibliography.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (421kB)
[thumbnail of Appendices] Text (Appendices)
Appendices.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (4MB)

Abstract

DC Interior merupakan perusahaan desain interior yang berfokus pada penyediaan layanan desain dan konstruksi sejak tahun 2016. Perusahaan ini menggabungkan kreativitas dan keahlian teknis dalam memberikan solusi desain yang professional dari tahap mendesain, perencanaan hingga pelaksanaan di lapangan. Dalam mengelola proyek, DC Interior mengimplementasikan Fast-Moving System, yang terdiri dari empat aspek utama yaitu, Komunikasi, Teknologi, Fondasi dan Mobilitas. Sistem ini bertujuan untuk meningkatkan efisiensi kerja, memperlancar alur informasi antara pihak terkait, memastikan proyek berjalan sesuai jadwal, serta mengontrol biaya secara efektif untuk memastikan penggunaan anggaran yang optimal sepanjang proyek. Penelitian ini akan berfokus pada proyek desain dan konstruksi Klinik PIK2, Jakarta Utara, yang berlangsung dari Mei 2024 hingga Maret 2025. Dengan menggunakan pendekatan riset etnografi dan teknik observasi partisipatif, penulis akan terlibat langsung dalam keseluruhan proses desain dan konstruksi proyek tersebut. Dengan metode studi kasus intrinsik, penulis akan mengekplorasi dampak implementasi strategi DC Interior terhadap kelancaran proyek dilihat dari segi efisiensi waktu dan biaya efektif. Hasil dari penelitian ini diharapkan dapat memberikan wawasan mengenai peran strategi-strategi yang diterapkan oleh DC Interior dalam mengoptimalkan pengelolaan proyek, serta mengidentifikasi tantangan yang mungkin dihadapi selama proses desain dan kontruksi. / DC Interior is an interior design company focused on providing design and construction services since 2016. The company combines creativity and technical expertise to deliver professional design solutions, from the design phase, planning, to implementation on-site. In managing projects, DC Interior implements the Fast-Moving System, which consists of four main aspects: Communication, Technology, Foundation, and Mobility. This system aims to improve work efficiency, streamline communication among stakeholders, ensure the project stays on schedule, and effectively control costs to ensure optimal budget use throughout the project. This research will focus on the design and construction project of the PIK2 Clinic in North Jakarta, which start from May 2024 to March 2025. Using an ethnographic research approach and participatory observation techniques, the researcher will be directly involved in the entire design and construction process of the project. Through an intrinsic case study method, the researcher will explore the impact of the implementation of both DC Interior strategies on the project's progress, focusing on time efficiency and cost-effectiveness. The results of this study are expected to provide insights into the role of the strategies implemented by DC Interior in optimizing project management, as well as identifying the challenges that may arise during the design and construction processes.
Item Type: Thesis (Bachelor)
Creators:
Creators
NIM
Email
ORCID
Suripto, Chyntia Angel
NIM01024210055
chyntiaangel081009@gmail.com
UNSPECIFIED
Contributors:
Contribution
Contributors
NIDN/NIDK
Email
Thesis advisor
Wiradinata, Kuntara
NIDN88000271
kuntara.wiradinata@lecturer.uph.edu
Uncontrolled Keywords: Fast-Moving System; Komunikasi; Teknologi; Fondasi; Mobilitas
Subjects: N Fine Arts > NK Decorative arts Applied arts Decoration and ornament
Divisions: University Subject > Current > Faculty/School - UPH Karawaci > School of Design > Interior Design
Current > Faculty/School - UPH Karawaci > School of Design > Interior Design
Depositing User: CHYNTIA ANGEL SURIPTO
Date Deposited: 26 Jun 2025 08:07
Last Modified: 26 Jun 2025 08:07
URI: http://repository.uph.edu/id/eprint/68947

Actions (login required)

View Item
View Item