Tumanggor, Ade Imanuel (2020) Pengaruh risiko penyedia jasa konstruksi terhadap keberhasilan kinerja waktu pelaksanaan proyek konstruksi rancang bangun kawasan bangunan gedung Apartemen Emerald pt. xyz. Masters thesis, Universitas Pelita Harapan.
![Title [thumbnail of Title]](http://repository.uph.edu/style/images/fileicons/text.png)
ilovepdf_merged.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (3MB)
Preview
Abstract.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (272kB) | Preview
Preview
toc.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (805kB) | Preview
Preview
chapter 1.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (777kB) | Preview
![Chapter 2 [thumbnail of Chapter 2]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 2.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (4MB)
![Chapter 3 [thumbnail of Chapter 3]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 3.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (1MB)
![Chapter 4 [thumbnail of Chapter 4]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 4.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (5MB)
![Chapter 5 [thumbnail of Chapter 5]](http://repository.uph.edu/style/images/fileicons/text.png)
chapter 5.pdf
Restricted to Registered users only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (181kB)
Preview
bibliography.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (182kB) | Preview
![Appendices [thumbnail of Appendices]](http://repository.uph.edu/style/images/fileicons/text.png)
appendices.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (1MB)
Abstract
Construction projects that have a high level of complexity in their implementation will
potentially have a higher risk than construction projects with a low level of complexity.
Uncertain risks make the parties concerned in the world of construction to distribute risks to
other parties, one of them by the method of implementing construction design projects. Where
in this contract the consultant and contractor become an implementation contract so that the
construction process is faster and coordination is easier. This study aims to determine the risk
factors and variables of construction service providers in the implementation of construction
projects for building construction of apartment buildings, determine the benchmarks of
successful performance when implementing construction projects of apartment buildings,
determine the influence of factors and risk factors for construction service providers on the
successful performance of project implementation time construction of the emerald apartment
building area and provide recommendations for improvement of the results of the analysis of
the research model. The research method uses qualitative descriptive methods and descriptive
statistical methods as well as quantitative associative with SPSS version 23. The results of this
study produce 3 factors and 5 risk variables for construction service providers that can
influence the successful implementation of construction projects of emerald apartment building
buildings consisting of; the Designer Team factor, the Builder Team, and the Project Manager
factor. From the results of the analysis supported by literature studies and field studies show
that the Project Manager factor has a significant influence on time performance as well as a
benchmark for the successful implementation of construction projects of emerald apartment
building buildings with variable X3.6, namely the lack of PM experience in scheduling all
activities work with an R square change value of 53.9%. Paying attention to critical work in
every construction project activity and placing resources in accordance with its productivity
are important in scheduling construction projects, so that the risk of delays can be minimized
and the time performance of construction implementation can be increased. / Proyek konstruksi yang memiliki tingkat kompleksitas tinggi dalam pelaksanaanya maka akan
berpotensi memiliki risiko yang lebih tinggi dibanding proyek konstruksi dengan tingkat
kompleksitas yang rendah. Risiko yang tidak pasti membuat para pihak yang berkepentingan
dalam dunia konstruksi mendistribusikan risiko ke pihak lain salah satunya dengan metode
pelaksanaan proyek konstruksi rancang bangun. Dimana dalam kontrak ini konsultan dan
kontraktor menjadi satu kontrak pelaksanaan agar proses konstruksi lebih cepat dan koordinasi
lebih mudah. Penelitian ini bertujuan untuk mengetahui faktor dan variabel risiko penyedia jasa
konstruksi dalam pelaksanaan proyek konstruksi rancang bangun bangunan gedung apartemen,
mengetahui tolak ukur keberhasilan pelaksanaan proyek konstruksi bangunan gedung
apartemen, mengetahui pengaruh faktor dan variabel risiko penyedia jasa konstruksi terhadap
keberhasilan pelaksanaan proyek konstruksi kawasan bangunan gedung apartemen emerald dan
memberikan rekomendasi perbaikan terhadap hasil analisis model penelitian. Metode penelitian
menggunakan metode deskriptif kualitatif dan metode statistik deskriptif serta asosiatif
kuantitatif dengan SPSS version 23. Hasil penelitian ini menghasilkan 3 faktor dan 5 variabel
risiko penyedia jasa konstruksi yang dapat mempengaruhi keberhasilan pelaksanaan proyek
konstruksi rancang bangun kawasan bangunan gedung apartemen emerald terdiri dari; faktor
Designer Team, Builder Team, serta faktor Project Manager. Dari hasil analisis yang didukung
studi literatur dan studi lapangan menunjukkan bahwa faktor Project Manager memilki
pengaruh signifikan terhadap kinerja waktu yang sekaligus sebagai tolak ukur keberhasilan
pelaksanaan proyek konstruksi dengan variabel X3.6 yaitu tidak adanya pengalaman PM dalam
melakukan penjadwalan seluruh aktifitas pekerjaan dengan nilai R square change sebesar
53,9%. Memperhatikan pekerjaan kritis pada setiap aktifitas proyek konstruksi serta
menempatkan sumber daya sesuai dengan produktivitas yang dimilikinya menjadi hal penting
dalam penjadwalan proyek konstruksi, agar risiko keterlambatan dapat diminimalisir dan
kinerja waktu pelaksanaan konstruksi dapat ditingkatkan.
Item Type: | Thesis (Masters) |
---|---|
Creators: | Creators NIM Email ORCID Tumanggor, Ade Imanuel NIM01629170007 UNSPECIFIED UNSPECIFIED |
Contributors: | Contribution Contributors NIDN/NIDK Email Thesis advisor Simanjuntak, Manlian Ronald A. NIDN0330117401 UNSPECIFIED |
Additional Information: | T 29-17 TUM p |
Uncontrolled Keywords: | Risk, Contractor ; Design And Build ; Apartement Building ; Time performance |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | University Subject > Historic > Faculty/School > Master of Civil Engineering Historic > Faculty/School > Master of Civil Engineering |
Depositing User: | Users 3197 not found. |
Date Deposited: | 12 Mar 2020 07:35 |
Last Modified: | 08 Dec 2021 02:45 |
URI: | http://repository.uph.edu/id/eprint/8380 |